From Requirement to Configuration

Engineering Support From Requirement to Product Configuration

Not every HVAC requirement can be solved by choosing a model from a catalogue. Projects may involve unusual temperatures, fixed installation dimensions, hazardous atmospheres, high filtration requirements, corrosive gases, difficult water conditions or equipment that must integrate with an existing system.

YONGFAN Technical Support helps customers organize these requirements and identify an appropriate product family, model range and configuration. You do not need to know the final model before contacting us.

Project Data Drawings BOQ Equipment Schedule Existing Datasheet Nameplate Photo
Engineers reviewing project drawings for HVAC product configuration
Data · Family · Range · Configuration
What We Can Help With

Product Selection

If you know the duty but not the model, YONGFAN can help narrow the product range. Current fan documentation specifically includes airflow/static-pressure sizing and series-selection support.

Fans

Airflow + pressure + application conditions

Filters

Efficiency + airflow + resistance + dimensions

Heat Exchangers

Heat source + temperatures + load + water quality

Hydronic Equipment

Flow + head + system pressure

Chemical Filtration

Target gas + concentration + airflow + application objective

Configuration Review

When a Standard Model Needs Additional Options

A standard product platform may still require project-specific configuration. Technical support helps determine whether a standard model is sufficient, or a configured / customized product is required.

Dimensions Materials Motor Voltage Filtration grade Pressure class Actuator Control method Accessories Explosion-proof High-temperature
Standard model? Configured product? Custom build?
Configuration review of HVAC product options
Options locked against the duty
Drawing Support

Coordinate the Product With the Project

For suitable products, YONGFAN technical support can provide relevant drawings and dimensional information. Current ventilation documentation includes dimensioned drawings and performance curves among pre-sales technical-support services. Heat-exchanger documentation also includes technical drawings and nozzle schedules for project design and installation.

  • Duct coordination
  • Plant-room layout
  • Piping connections
  • Equipment clearances
  • Retrofit interfaces
  • Tender submissions
Technical drawings for duct, plant-room and piping coordination
Drawings · Curves · Nozzle schedules
Retrofit & Replacement Support

Replace by Specification—Not by Appearance

Existing equipment does not always have to be replaced with the same brand. But replacement selection should not be based only on external appearance, nominal size, or connection diameter.

Function Performance Dimensions Connections Electrical Requirements Control Interface

For a retrofit enquiry, send as much of the following as possible:

  • Existing manufacturer and model
  • Nameplate photo
  • Overall dimensions
  • Flange / connection dimensions
  • Airflow or flow, pressure, voltage
  • Existing drawings

Selected YONGFAN fan products are documented with compatible flange arrangements across related configurations, illustrating why interface information can be important in retrofit work.

Retrofit replacement evaluated by specification and interface
Function + Performance + Interface
Fan Technical Support

Start With the Duty Point

YONGFAN fan materials state that final selection should be confirmed against project airflow, static pressure and actual duty conditions.

Required Airflow
______ m³/h
Required Pressure
______ Pa
Air Temperature
______ °C
Application
Ventilation / Exhaust / Smoke Control / Process / Tunnel
Airstream
Clean / Dusty / Humid / Corrosive / Hazardous
Installation
Duct / Wall / Roof / Tunnel / Other
Electrical Requirement
Voltage / Frequency / Phase
Special Requirement
Noise / High Temperature / Explosion-Proof
Fan technical support from airflow and pressure
Airflow · Pa · Temperature · Duty
Air Filtration Support

Efficiency Is Only One Selection Parameter

YONGFAN’s filtration materials use airflow, resistance, cleanliness requirement and installation dimensions as relevant selection factors.

Required Filtration Stage
Primary / Medium / Final
Efficiency Requirement
Project grade or applicable classification
Rated Airflow
______ m³/h
Available Resistance
______ Pa
Filter Size
______ × ______ × ______ mm
Application
Commercial HVAC / Cleanroom / Pharmaceutical / Electronics / Other
Operating Conditions
Temperature / Humidity
Air filtration support beyond filter grade
Stage · Grade · ΔP · Frame
High-Efficiency Filtration Support

Confirm the Complete Installation

For HEPA or other high-efficiency filtration, also provide housing type, seal arrangement, final-stage requirement, available fan pressure and required test documentation.

High-efficiency filter performance should be considered together with installation sealing and system resistance. Current YONGFAN filtration documentation references scan/leak testing for applicable high-efficiency grades.

High-efficiency filtration housing and seal review
Housing · Seal · Scan / leak test
Chemical Filtration Support

Identify the Contaminant Before Selecting the Unit

Chemical-filtration projects require more application information than ordinary particulate filtration. YONGFAN’s gas-phase filtration documentation explicitly distinguishes room-protection systems from exhaust-treatment systems and requests airflow, gas analysis and application function for selection.

H₂S SO₂ Cl₂ NOx NH₃ VOCs Other
Protect Indoor Equipment

Control rooms, server rooms, electrical rooms, instrument rooms.

Treat Exhaust Before Discharge

A different architecture from room-protection systems.

Also send
Concentration (if available) · Airflow ______ m³/h · Room volume ______ m³ · Existing environmental data
Chemical filtration support starting from gas analysis
Gas · Concentration · Protect or treat
Heat Exchanger Support

Start With the Thermal Requirement

YONGFAN’s heat-exchange documentation specifically uses heat source, temperatures, load and water quality to determine exchanger type, capacity and material.

Heat Source
Steam / Hot Water / Other
Primary Side
Inlet ______ °C · Outlet ______ °C
Secondary Side
Inlet ______ °C · Outlet ______ °C
Heat Load
______ kW
Flow
______ m³/h
Working Pressure
______ MPa
Water / Medium
Describe water quality or process medium
Storage Requirement
Yes / No
Heat exchanger support from thermal duty
Source · ΔT · kW · MPa
Material Selection Support

The Medium Matters

Material choice can be critical for heat exchangers and other water-contact equipment. If water or process conditions are unusual, provide chloride level, hardness, pH, temperature and process medium rather than selecting material only from price.

SUS304 316 316L 316Ti Copper Titanium Hastelloy
Material selection based on water and process medium
Not price-first. Medium-first.
Hydronic technical support
Hydronic Technical Support

Flow, Pressure and System Volume

Flow
______ m³/h
Required Head
______ m
Working Pressure
______ MPa
System Volume
______ m³
Temperature / Pipe Size
______ °C · DN ______
Water Make-Up Expansion Water Supply Distribution Condensate Recovery Treatment
Controls and valve support
Controls & Valve Support

Match the Control Function

For controls and valves, send valve function, DN, flow, differential pressure, connection type, voltage, control signal, normally open / normally closed, and existing actuator or controller information.

For retrofit projects, photos and the original product datasheet can significantly improve cross-reference accuracy.

Tunnel Ventilation Support

Tunnel Fans Require System-Level Data

Jet-fan selection cannot be reduced to airflow alone. YONGFAN’s SDS/SDS(R) materials identify selection factors including tunnel dimensions, traffic volume, vehicle emissions, CO / NOx limits, tunnel air velocity, fire-emergency requirement and installed thrust, and state that fan quantity and configuration are confirmed against project thrust calculations.

Tunnel Length Cross Section Traffic Data Required Air Velocity Fire Strategy Existing Pressure / Thrust Calculation
Tunnel ventilation support based on thrust calculations
Thrust · Velocity · Fire strategy
Smoke-Exhaust & Hazardous Applications

Critical-Duty Products Need Clear Requirements

Some applications involve safety-related operating conditions: fire smoke exhaust, hazardous-area ventilation, explosion-proof equipment, high-temperature emergency operation.

  • Applicable project standard
  • Required temperature / duration
  • Hazardous-area classification
  • Required Ex configuration
  • Motor requirements
  • Destination market

Selected YONGFAN fan materials reference GB 3836 for applicable explosion-proof variants and specify configuration-dependent safety requirements. Final applicability must be confirmed against the selected product and project requirement.

Hazardous-area and smoke-exhaust duty confirmation
GB 3836 · Ex · Emergency duty
Technical document support
Technical Document Support

Cannot find the file you need?

Technical Support can help identify datasheets, performance curves, drawings, manuals, material information, test records and applicable certificates.

When requesting a document, provide product, model, configuration, required document and destination market. Applicable certificates should be confirmed by product and order configuration.

Project submittal support
Project Submittal Support

Information for consultant and contractor review

Depending on product and project, technical support can help prepare technical specification, performance data, dimensions, materials, drawings, connection schedules and applicable test information.

Quoted equipment = submitted equipment
OEM technical support
OEM Technical Support

Define the product before defining the brand

For OEM or private-label projects, first establish base product, performance, dimensions, materials, electrical configuration, options and applicable documentation. After the technical configuration is agreed, branding and packaging can be coordinated.

Pre-Order Technical Review

Confirm Critical Details Before Production

Correcting these points before production is usually much easier than correcting them after shipment.

Model

Is the correct series selected?

Duty

Does the configuration match the operating requirement?

Dimensions

Will the equipment fit?

Material

Is it suitable for the medium or environment?

Electrical

Are voltage and motor/control requirements correct?

Compliance

What standards or certificates are required?

Documentation

What drawings or technical files must be supplied?

Rule

Lock the configuration before the production release.

Installation support after purchase order
Installation Support

Technical Support Does Not End at the Purchase Order

Current YONGFAN ventilation documentation includes installation guidance and remote technical support for applicable products.

Mounting Duct connection Pipe connection Electrical connection Rotation direction Installation clearance Startup checks Commissioning questions
Troubleshooting based on measured data
Troubleshooting Support

Start With Measured Data

Fans: measured airflow, pressure, motor current, rotation direction, duct arrangement.

Filters: measured pressure drop, installed airflow, filter condition, installation seal.

Heat exchangers: inlet/outlet temperatures, flow, pressure, water condition.

Controls: voltage, control signal, valve position, controller status.

Not “the fan is weak” or “the heat exchanger is not working well.”
What Technical Support Does Not Replace

Project Design Responsibility Remains With the Project Team

YONGFAN can support product selection, configuration, product data, technical drawings and equipment-related guidance.

However, final building or process-system design may involve local codes, fire strategy, structural design, electrical design, overall control sequence and complete system calculations. These responsibilities should remain with the qualified project designer, consultant or responsible engineering organization.

This distinction is particularly important for fire, hazardous-area, pressure and life-safety applications.
Project design responsibility remains with the project team
Equipment support ≠ system design
How to Get a Faster Technical Response

Send More Than “Please Quote”

These enquiries allow the technical team to begin with actual engineering parameters.

“We need an exhaust fan for 22,000 m³/h at 850 Pa, handling humid industrial air at approximately 55°C.”
“We need an F9 filter for 3,200 m³/h in a 595 × 595 × 600 mm existing housing.”
“We need to protect a control room from H₂S and SO₂. Room volume is 450 m³ and required fresh air is approximately 2,000 m³/h.”
“We need a heat exchanger for 500 kW with 80/60°C primary water and 50/60°C secondary water.”
Submit Your Project

Send Whatever Information You Already Have

YONGFAN can help organize the requirement into application, product family, selection parameters, recommended configuration and technical documentation.

Application Product Family Selection Parameters Recommended Configuration Technical Documentation
BOQ Equipment Schedule Technical Specification Drawing Existing Datasheet Nameplate Photo Duty Point Operating Conditions
Submit project data for YONGFAN technical support